An on grid solar system is a rooftop plant that works together with the electricity grid. Your panels make power during the day, your home uses what it needs, and the surplus flows to the grid through a net meter. At night, or on a cloudy day, you draw from the grid as usual.

The PM Surya Ghar subsidy supports this design, so it is also the most common choice for Indian homes. It is cheaper than battery-based systems and needs almost no maintenance. It also has one catch that surprises many buyers: it switches off during a power cut. This guide explains both sides.

Quick answer: This kind of plant has panels, a grid-tied inverter, a net meter and a mounting structure, but no battery. It cuts your bill by feeding surplus power to the grid. A 3 kW system typically costs ₹1.8 to ₹2.4 lakh before the ₹78,000 central subsidy.

Key takeaways

  • Grid-tied plants have no battery, so they cost far less than hybrid or off-grid systems.
  • Surplus power goes to the grid, and the DISCOM credits it to your bill through net metering.
  • The system shuts down when the grid fails, for the safety of line workers.
  • Only grid-connected systems qualify for the PM Surya Ghar subsidy.
  • A 3 kW system suits a family using 300 to 400 units a month.
  • Check your own figures with the solar calculator before you ask for quotes.

How the plant works

The idea is simple, but each step matters for how much you save.

  1. Solar panels turn sunlight into direct current (DC) electricity.
  2. The grid-tied inverter converts DC into alternating current (AC) that matches the grid’s voltage and frequency.
  3. Your home appliances use this power first.
  4. Any extra units flow out through the net meter to the DISCOM’s lines.
  5. When the panels produce nothing, such as at night, the grid supplies your home.

The net meter records both directions. At the end of the billing cycle, the DISCOM subtracts exported units from imported units and bills you for the difference. If you export more than you import, the surplus carries forward as credit, depending on your state’s rules. Our net metering guides explain how those rules differ.

Why the system shuts down in a power cut

This is the point most buyers miss. A grid-tied inverter needs the grid’s signal to run. When the grid goes down, the inverter stops on purpose. Otherwise, your panels would push power into a dead line and could injure a worker repairing it.

As a result, an on-grid plant cannot run your fan or fridge during an outage. If you face long, frequent cuts, you should look at a hybrid solar inverter with batteries, which costs more but keeps the lights on.

Parts of an on grid solar system

PartWhat it doesTypical life
Solar panelsConvert sunlight to DC power25 years
Grid-tied inverterConverts DC to AC and syncs with the grid8 – 12 years
Mounting structureHolds panels at the right tilt25 years
Net meterMeasures import and exportProvided by DISCOM
Cables, ACDB and DCDBConnect and protect the system15 – 25 years
Earthing and lightning arresterProtect people and equipment15 – 25 years

The inverter is the part most likely to need replacement during the system’s life. Ask the vendor about its warranty, because five years is common and ten is better. Our solar inverter guide covers the options.

On-grid vs off-grid vs hybrid

FeatureOn-gridOff-gridHybrid
BatteryNoYesYes
Works in power cutNoYesYes
Net meteringYesNoYes
PM Surya Ghar subsidyYesNoOnly grid-tied part, subject to rules
Relative costLowestMedium to highHighest
Best forCities with stable powerRemote places without gridHomes facing long cuts

For most urban and semi-urban homes, the on-grid system wins on cost and payback. The hybrid system makes sense only when outages are long enough to hurt, such as a home office or a medical device that needs power.

How much does an on grid solar system cost?

Prices depend on the brand, panel type and city. The figures below are indicative market ranges for 2026 and include installation.

System sizeIndicative priceCentral subsidyCost after subsidy
1 kW₹60,000 – ₹80,000₹30,000₹30,000 – ₹50,000
2 kW₹1,10,000 – ₹1,50,000₹60,000₹50,000 – ₹90,000
3 kW₹1,80,000 – ₹2,40,000₹78,000₹1,02,000 – ₹1,62,000
5 kW₹3,00,000 – ₹3,80,000₹78,000₹2,22,000 – ₹3,02,000

Because the subsidy stops at 3 kW, the 3 kW size gives the best cost-to-benefit ratio for most homes. Larger systems still pay back, but more slowly. Compare real quotes with our solar panel price guide.

What changes the price

  • Panel type. Mono PERC panels cost less than TOPCon panels, which are a little more efficient.
  • Domestic content. Subsidy-eligible modules must meet domestic-content rules, and these cost more than imported ones.
  • Inverter brand. A trusted brand with a ten-year warranty adds a few thousand rupees but lowers long-term risk.
  • Roof type. A flat concrete roof is cheaper to fit than a tin sheet or sloping roof that needs a taller structure.
  • City and distance. Transport and local labour rates vary.

How much will you save?

A well-placed 3 kW system produces about 12 units a day on average, or around 360 units a month. At ₹7 per unit, that is roughly ₹2,500 a month, or ₹30,000 a year. A ₹1 lakh net cost pays back in about three to four years.

Your real saving depends on your tariff slab. In states where higher slabs cost much more per unit, solar removes your most expensive units first, so the saving per unit is higher than the average. The solar bill savings calculator lets you test your own bill.

How much power does it make through the year?

Output is not flat. It rises in spring, dips in the monsoon and recovers after. The table shows typical daily generation per kW for a well-placed, south-facing roof in north and central India. Treat it as a planning guide, because shade, dust and tilt shift every number.

MonthUnits per kW per dayUnits from a 3 kW plant per month
January3.4305
February4.0336
March4.6415
April5.0450
May5.0450
June4.2378
July3.4315
August3.5325
September4.0360
October4.2380
November3.7333
December3.2298

Across the year, that adds up to roughly 4,350 units from a 3 kW plant, close to 12 units a day. The monsoon months produce less, but your bill is usually lower then too. Summer is the reverse, and that is when air conditioners push consumption up. Because net metering banks surplus power, the generous spring output offsets part of the summer demand.

Panel angle changes these figures. A tilt close to your latitude works best over the year, and our solar panel tilt angle calculator gives the setting for your city.

Net metering, gross metering and net billing

States use different billing models, and the difference changes what you earn from the surplus. Check which one your DISCOM applies before you size the plant.

ModelHow it worksWho benefits
Net meteringExported units are subtracted from imported units on the same billHomes that use most of their solar power
Net billingExports are valued at a set rate and billed separately from importsHomes with large surplus, depending on the rate
Gross meteringAll solar power goes to the grid at a feed-in tariff and you buy your usage separatelyRare for homes, more common for larger plants

For small residential plants, net metering is the usual model. The central rules allow it up to the sanctioned load, and the 2024 amendment removed the technical feasibility study for systems up to 10 kW. That cut a major source of delay.

Common problems and what to do

Most faults are simple. The table lists the ones that homeowners report most.

SymptomLikely causeWhat to do
Output suddenly drops by 15 percent or moreDust, bird droppings or new shadeClean the panels and check for shadows
Inverter shows a grid faultVoltage outside the allowed bandWait, and call the DISCOM if it repeats daily
Plant produces nothingBreaker tripped or inverter in errorCheck the isolator, then call the installer
Net meter shows no exportMeter not configured for exportAsk the DISCOM to check the meter settings
Bill is still highUsage rose or tariff slab changedCompare units, not rupees, with last year

Keep the vendor’s phone number and the warranty papers together. A fault in the first year is the vendor’s problem, so report it promptly and in writing.

A worked example

Take a family in a two-bedroom flat-roof home with a monthly bill of about ₹3,200. They use roughly 400 units a month, with two air conditioners running from April to September. A 3 kW plant covers most of that use.

ItemBefore solarAfter solar
Monthly units from the grid400About 60 to 100
Average monthly bill₹3,200₹500 to ₹900, mostly fixed charges
Yearly saving–About ₹28,000 to ₹32,000

The family still pays fixed charges and some units in winter, so the bill never reaches zero. That is normal. What matters is that the saving of roughly ₹2,500 a month covers the system’s cost within a few years.

Who should choose a grid-tied plant?

Choose it if you:

  • have a stable grid supply with short outages.
  • pay a monthly bill above ₹1,500.
  • own a roof with at least 10 square metres of shade-free space per kW.
  • want the central subsidy.

Think twice if you:

  • face daily outages of several hours.
  • live in a tenanted house without the owner’s consent.
  • have a roof that is mostly shaded.

Installation steps and timeline

The process matters as much as the equipment, because a mistake can delay the subsidy.

  1. Apply on the national portal and wait for the DISCOM’s approval.
  2. Choose a vendor registered with your DISCOM.
  3. Let the vendor survey the roof and finalise the design.
  4. Install the panels, inverter and wiring, which usually takes one to three days for a home.
  5. Apply for the net meter and get the DISCOM inspection.
  6. Receive the commissioning certificate and claim the subsidy.

Our guide to the PM Surya Ghar Yojana lists the documents for each step.

Maintenance: what you actually need to do

On-grid systems are low-maintenance. Clean the panels with water every two to three weeks, and more often in dusty areas. Check the inverter display for error codes, and look at the monthly generation. A sudden drop of more than 15 percent usually means shade, dirt or a fault.

Do not climb onto the roof to clean panels in the heat of the day, because hot glass can crack under cold water. Early morning is the better time.

Mistakes to avoid

  • Choosing the cheapest quote. A very low price usually means weak panels, thin cables or a missing warranty.
  • Ignoring shade. Check the roof at 10 am and 3 pm, not only at noon.
  • Skipping the net meter. Without one, your exported units earn nothing.
  • Oversizing. A plant bigger than your annual use produces credits that may not pay out at a good rate.
  • Forgetting the inverter warranty. Read the paperwork before paying.

Frequently asked questions

What is an on grid solar system?

It is a rooftop plant connected to the electricity grid, with no battery. Your home uses solar power first, sends the surplus to the grid and draws from the grid when the panels are idle.

Does a grid-tied plant work during a power cut?

No. The inverter shuts down when the grid fails, as a safety measure. You need a hybrid or off-grid system with batteries for backup power.

Is it eligible for subsidy?

Yes. Grid-connected residential systems qualify for the PM Surya Ghar subsidy of up to ₹78,000, provided you use a registered vendor and eligible equipment.

How much roof space does a 3 kW system need?

About 30 square metres of shade-free roof, using the usual rule of 10 square metres per kW. Modern 550-watt panels can reduce this slightly.

Can I run an air conditioner on solar power?

Yes, during the day. The system supplies the AC with solar power and tops up from the grid when needed. A 1.5-ton AC uses roughly 1.5 kW, so a 3 kW plant can carry one or two units in sunshine.

How long does the plant last?

Panels last 25 years or more with gradual output decline. The inverter usually needs replacing once, after 8 to 12 years.

Do I need a battery?

No. The grid acts as your storage, and net metering credits your exports. Batteries add cost and are only useful if you want power backup.

Is an on grid solar system right for you?

For a typical Indian home with a steady supply, this design gives the shortest payback and the strongest subsidy support. Start by checking your monthly units, then size the plant with the rooftop solar calculator. After that, get at least two written quotes from registered vendors.

If power cuts are your main worry, weigh the extra cost of batteries before you decide. For everything else about the plant, browse the solar systems and appliances section or go back to the homepage.

*Solar News World is an independent information site. It is not a government website. Prices are indicative; confirm figures with registered vendors and the official portal.*