Net Metering: Complete Guide
Net metering in India explained: how import and export units are billed, what the 2024 rules changed, credit carry-forward and what homes should expect.
SSolar News World Editorial Team · 9 min read

Net metering is the billing arrangement that lets a rooftop solar owner send surplus power to the grid and get credit for it. Your electricity company counts what you take from the grid and what you send back. Then it bills you only for the difference.
Without it, a grid-connected solar plant would waste its extra daytime power. With it, the grid works like a bank. Daytime units go in as deposits, and night-time units come out as withdrawals. This guide explains how the meter works and how the bill adds up. It also covers what the central rules say and where state rules differ.
Quick answer: Net metering measures the units your home imports from the grid and the units your solar plant exports. The company subtracts exports from imports and bills the net amount. A surplus carries forward as credit, within the limits your state commission sets.
Key takeaways
- A net meter records power flowing both ways, from the grid to your home and from your home to the grid.
- You pay only for net units, plus fixed charges.
- Surplus credit usually carries forward month to month. Many states settle what is left at the end of the financial year.
- Central rules since 2024 exempt rooftop systems up to 10 kW from a technical feasibility study.
- You need this meter to qualify for the PM Surya Ghar subsidy.
- Estimate your savings with the solar bill savings calculator.
How the meter works
The idea is simple. A bidirectional meter replaces your old meter, or the company adds a second one. It keeps one count for units drawn from the grid and another for units pushed back.
- During the day, your panels power the house first.
- If the panels make more than the house uses, the extra flows to the grid. The export count rises.
- At night, the house draws from the grid, and the import count rises.
- At the end of the billing cycle, the company works out net units as imports minus exports.
If imports exceed exports, you pay for the difference. If exports exceed imports, the extra units move to your next bill as credit.
A bill example
Take a home that imported 380 units and exported 270 units in a month.
| Item | Units |
|---|---|
| Imported from the grid | 380 |
| Exported to the grid | 270 |
| Net units billed | 110 |
The company bills 110 units at your tariff slab, plus fixed charges and taxes. Without solar, the same home would pay for all 380 units. The gap between the two bills is your saving.
Notice that exported units do not turn into cash each month. Instead, they cancel imports. At the end of the financial year, many states pay out leftover credit at a set rate. That rate is usually lower than the retail tariff. For that reason, size the plant to your own use rather than to the roof.
Net metering, net billing and gross metering
People mix up the three models, but the difference changes what you earn.
| Model | How exports are treated | Typical use |
|---|---|---|
| Net metering | Units offset imports one-for-one | Small homes and housing societies |
| Net billing | Exports and imports are priced at different rates | States that prefer value-based settlement |
| Gross metering | The company buys all generation, and you buy your usage separately | Larger or commercial plants |
Central rules allow the first model up to your sanctioned load, or up to 500 kW, whichever is lower. They also let state commissions permit gross metering for owners who want to sell everything. Residential owners nearly always get the first model. Still, check your state regulation before you sign a vendor contract, because some states have moved towards the second.
What the 2024 rule changes did
In February 2024, the Ministry of Power amended the Electricity (Rights of Consumers) Rules to speed up rooftop solar. Four changes matter to homeowners.
| Change | Effect |
|---|---|
| No technical feasibility study up to 10 kW | Removes a major source of delay for homes |
| Shorter study timeline above 10 kW | Cut from 20 days to 15 days |
| Faster commissioning | Timeline cut from 30 days to 15 days |
| Distribution company pays for upgrades up to 5 kW | Homeowners avoid grid-strengthening fees |
State commissions still apply the details, so real timelines can differ. Even so, the rules give you a stronger case when a company drags its feet.
Types of meters you may see
The vendor usually arranges the meter, but you should know what the company installs.
- Bidirectional meter. One unit records import and export separately. Most homes get this one.
- Separate generation meter. Some companies also meter the solar output for verification.
- Smart meter. Remote-readable meters send data to the company automatically.
Make sure the company seals and calibrates the meter. A meter fitted without approval may not count exports, and you could lose credit. Our guide to the application steps is on the way in the solar systems and appliances section.
Who needs it?
Anyone with a grid-connected rooftop plant needs it. The word on-grid exists because the meter ties the plant to the grid. Our on-grid solar system guide describes the whole plant. Off-grid homes store energy in batteries and have no grid link, so they skip it.
The PM Surya Ghar subsidy also depends on it. The government pays only after the company installs the meter and commissions the plant. Our PM Surya Ghar Yojana guide lists the full sequence.
How credit builds up through the year
Seasons shape your balance. Spring brings strong output with moderate use, so credit grows. Summer brings air conditioners, so credit drains. The monsoon cuts output, and winter output stays modest. The table shows a simple pattern for a 3 kW plant and a home that uses about 350 units a month.
| Season | Solar output (units) | Home use (units) | Effect on credit |
|---|---|---|---|
| Spring (Mar – Apr) | 430 | 300 | Credit builds |
| Summer (May – Jun) | 410 | 520 | Credit drains |
| Monsoon (Jul – Sep) | 330 | 340 | Roughly even |
| Winter (Nov – Jan) | 310 | 260 | Small credit builds |
These numbers are illustrative, not guarantees. They show why banking matters. Spring surplus softens the summer bill, so the yearly net can sit near zero even when single months do not.
How net metering affects your savings
Savings depend on your tariff and your daily routine.
| Home type | Usage pattern | What happens |
|---|---|---|
| Day-heavy use (home office, daytime AC) | Uses most solar directly | Small export, big direct saving |
| Evening-heavy use (family out all day) | Exports most solar, imports at night | The meter does the heavy lifting |
| Seasonal use (summer AC peak) | Winter surplus, summer deficit | Banked credit offsets summer bills |
In most regimes, an exported unit cancels an imported unit at the same slab rate. So a unit sent out at noon can wipe out an expensive evening unit. That is the real appeal. The exact treatment, however, differs by state, so read your commission’s order.
A meter vs a battery
Some people ask why they should not use batteries instead. Batteries store energy for you, but they cost a lot and wear out. The grid does the same job for free.
| Point | Net meter | Battery storage |
|---|---|---|
| Extra cost | Small or none | High |
| Backup during power cuts | No | Yes |
| Maintenance | None | Regular checks, replacement after years |
| Subsidy support | Yes | Not under the central rooftop scheme |
So choose batteries only for backup power, not to save money. For savings alone, the meter wins.
Charges and fees to expect
Metering itself is not a big expense, but a few charges can appear.
- Meter cost. Some companies supply the meter free, and others charge a fee.
- Application or inspection fee. It is usually small, and some states waive it.
- Fixed monthly charges. These stay even when net units hit zero.
- Grid upgrade charges. Up to 5 kW, the company should bear them under the central rules.
Ask the vendor to list each charge in the quote. If a fee is unclear, ask the company for a written breakdown.
Common problems and fixes
| Problem | Usual cause | What to do |
|---|---|---|
| Exports missing from the bill | Meter not set up for export | Ask the company to check the settings |
| Long delay after installation | Inspection backlog | Escalate on the portal and note the application number |
| Credit disappears at year end | State pays leftover credit at a low rate | Size the plant closer to your use |
| Bill higher than expected | Fixed charges or a slab change | Compare units, not rupees |
| Meter shows an error | Wiring or sealing issue | Report it in writing |
Check your first two bills carefully. That is when setting errors show up, and early correction costs nothing.
Does it work in every state?
Nearly every state offers it, but the details differ. State electricity regulatory commissions set the limits, the credit rules and the settlement rates. Some states cap residential systems at the sanctioned load. Others prefer net billing for larger plants. So read your commission’s order, or ask the vendor to show you the current regulation, before you finalise the plant size.
Frequently asked questions
What is net metering in simple words?
It is a billing method where your solar plant’s extra power goes to the grid and cancels units you take later. You pay only for the net units.
Is a net meter mandatory for the solar subsidy?
Yes. The PM Surya Ghar subsidy applies to grid-connected systems that have a net meter. The government pays after the company installs it and commissions the plant.
Do I get paid for extra units?
Usually you get credit that offsets future bills. Many states pay out leftover credit at a set rate at the end of the financial year, but rules vary.
How long does approval take?
The 2024 central rules shortened the timelines, and many homes get commissioned within a few weeks. Local backlog can stretch the wait.
Does it work during a power cut?
No. The grid-tied inverter shuts down during an outage for safety. You need a hybrid system with batteries for backup power.
Can I install a bigger plant than my usage?
You can, up to your sanctioned load in many states. However, extra export may earn less than the retail rate, so a plant sized to your yearly use usually earns the best return.
Who installs the meter?
The electricity company owns or approves it. Your vendor coordinates, but the company completes the installation and inspection.
What happens if I move house?
The subsidy and the meter belong to the connection and the property. Talk to the company and the vendor about credit and warranty before you sell.
Using net metering well
Net metering turns a rooftop plant from a daytime gadget into a full bill-reduction tool. Size the plant to your annual use and confirm your state’s credit rules. Then make the vendor handle the meter paperwork. After that, watch the first two bills closely.